Jaipur Metro Project Phase-2: Cabinet approves 41 km long North–South corridor

Completion of the project is targeted by September 2031

Dusmanta Behera
Dusmanta Behera - Editor-in-Chief
2 Min Read

NewzVille Desk

The Union Cabinet chaired by the Prime Minister Narendra Modi has approved Jaipur Metro Phase-2, a transformative 41 km long North–South corridor from Prahladpura to Todi Mod, comprising 36 stations, at a total project cost of ₹13,037.66 crore.

The project will be implemented by Rajasthan Metro Rail Corporation Limited (RMRCL), a 50:50 joint venture of the Government of India and the Government of Rajasthan.

The Phase-2 corridor will provide seamless connectivity to major activity nodes such as Sitapura Industrial Area, VKIA, Jaipur Airport, Tonk Road, SMS Hospital and Stadium, Ambabari and Vidhyadhar Nagar.

It includes underground stations at the airport area and will integrate with the operational Phase-1 through planned interchanges and feeder systems, ensuring a unified and continuous metro network across the city.

At present, Jaipur Metro Phase-1 records an average daily ridership of around 60,000 passengers on the shorter but critical 11.64 km corridor.

With the commissioning of Phase-2, the metro network is expected to witness a manifold increase in ridership, substantially enhancing the share of public transport in Jaipur and reducing dependence on private vehicles.

Jaipur Metro Phase-2 has undergone comprehensive appraisal at multiple levels, including Inter-Ministerial Consultation, Network Planning Group review and Public Investment Board evaluation.

The project has an Economic Internal Rate of Return (EIRR) which is more than threshold (>14%), indicating strong socio-economic viability.

The project is aligned with the Rajasthan TOD Policy-2025, proposed UMTA reforms, and national sustainable urban transport objectives.

The completion of the project is targeted by September 2031.

Jaipur already has an operational metro system under Phase-1, running along the East–West corridor from Mansarovar to Badi Chaupar, covering 11.64 km with 11 stations.

Share This Article
Dusmanta Behera
By Dusmanta Behera Editor-in-Chief
Follow:
Dusmanta Behera's pioneering experience of 26 years includes key roles at News Today Pvt Ltd, ETV Networks, Lok Sabha TV. Rajya Sabha TV, and Sansad TV. As an accredited Video Journalist for more than 15 years under MI&B, Government of India covered State Visits of Prime Minister and Vice President. Valuable Contributions include Series on "National Security" and Chamber Telecast. Key interest remains in Documentaries on Armed Forces and Travelogues.
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *