NewzVille Desk
Prime Minister Narendra Modi today visited the under-construction Bullet Train Station in Surat to review the progress of the Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR) — one of India’s most ambitious infrastructure projects.
The MAHSR spans approximately 508 kilometres, covering 352 km in Gujarat and Dadra & Nagar Haveli, and 156 km in Maharashtra.
The corridor will connect major cities including Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, and Mumbai, marking a transformative step in India’s transportation infrastructure.
Built with advanced engineering techniques, the project features 465 km (about 85% of the route) on viaducts, ensuring minimal land disturbance and enhanced safety. So far, 326 km of viaduct work has been completed, and 17 out of 25 river bridges have already been constructed.
The Bullet Train will reduce travel time between Mumbai and Ahmedabad to nearly two hours, revolutionizing inter-city travel by making it faster, easier, and more comfortable.
The Surat–Bilimora section, covering around 47 km, is in an advanced stage of completion, with civil works and track-bed laying fully completed. The design of the Surat station draws inspiration from the city’s world-renowned diamond industry, reflecting both elegance and functionality.



